Skip to main content

6.3.2

Version requirements

Controller version: venus 2.2

Device version: 6.3.2

Compatibility Notes

Controller venus_2.2 is compatible with all versions below 6.3.2

New features

[SDWAN-1366] - Support the deployment of evpn RR to solve the scalability problem of gateway fullmesh interconnection

[SDWAN-1825] - Smac server extension optimization, with the ability to support a large number of walls to obtain licenses

[SDWAN-1316] - Support ad (inter-protocol priority) adjustment for each route of static routing

[SDWAN-2723] - SNAT function optimization to improve the stability of no-nat

[SDWAN-2689] - Query Optimization: Search by service number will be displayed by default

[SDWAN-2690] - Query optimization: Nova Gateway supports searching for addresses by vrf

[SDWAN-2697] - [Front-end optimization: Modify the port configuration in site HA and add a reminder of device version requirements] (/tenant/config-site#ha-high-availability-function)

[SDWAN-2606] - Front-end optimization: dedicated line speed measurement front-end optimization (prompt for the default value of 1M)

[SDWAN-2688] - Front-end optimization: If the device is in operation and maintenance mode, the front-end will remind you more clearly

[SDWAN-2704] - Added display of swg license expiration time on the front end

[SDWAN-2766] - When the wan port is configured with a static address, addresses within the non-wan port address range are supported as gateways.

[SDWAN-2725] - Active flows need to show the path of the backhaul route

[SDWAN-2716] - 800D supports opening 3 advance swg

Fix bug

[SDWAN-2658] - Security log - During quick processing, the security instance does not display the site and instance, and the SN cannot be selected in the log query.

[SDWAN-2675] - Device Diagnostics-Bandwidth Speed Test Unable to test low priority interface bandwidth

[SDWAN-2679] - Configuration security protection failed to be delivered.

[SDWAN-2699] - In single-arm mode, static routes are not published successfully.

[SDWAN-2721] - Static routes in global vrf are lost after Nova Gateway FRR restart

[SDWAN-2796] - After the CPE restarts or goes down in a multi-vrf scenario, the route convergence time exceeds 2 minutes.